Saturday, October 5, 2013

Mid September Progress

The week was spend making and erecting trusses for the front deck.  I love the cloud formations in these shots.


6"x5" treated rough sawn posts.  We centered the posts away from windows of the house.

After 1 week, all of the decking timber dried and shrunk.  All deck was laid with no gaps, no there are 1/4" gaps...

This is the outside heat pump unit.  It is heating and cooling.

Finishing up the week making the hips, tying into the existing roof line.  The pitch is a "4 pitch", which means 4" per foot.  The deck is 12' wide, so it is 4' high at the house side.