The week was spend making and erecting trusses for the front deck. I love the cloud formations in these shots.
6"x5" treated rough sawn posts. We centered the posts away from windows of the house. |
After 1 week, all of the decking timber dried and shrunk. All deck was laid with no gaps, no there are 1/4" gaps... |
This is the outside heat pump unit. It is heating and cooling. |
Finishing up the week making the hips, tying into the existing roof line. The pitch is a "4 pitch", which means 4" per foot. The deck is 12' wide, so it is 4' high at the house side. |